The three-trolley hook bridge crane is mainly composed of bridge, crane running mechanism, trolley, electrical equipment, etc. According to the different utilization level and load status, it is divided into A5 and A6 working levels.
2. The entrance direction of the cab platform is divided into three types: side entrance, end entrance and top entrance
3. The cab is installed at the left end.
4. The crane can conduct electricity by sliding contact wire or angle steel, which can be on the opposite side of the cab or the same side of the cab.
5. The crane operation is completed in the cab.
Equipment introduction:
The three-trolley hook bridge crane is mainly composed of bridge, crane running mechanism, trolley, electrical equipment, etc.
According to the frequency of use, the work level is divided into A3, A4, A5 and A6.
Specifications:
Rated lifting capacity: 5t, 10t, 12.5t, 16/3.2t, 20/5t, 32/5t, 50/10t, 80/20t, 100/20t, 125t, 200/50t, etc.
Span: from 7.5m to 31.5m
Lifting height: from 3m to 30m
If there are other requirements for lifting capacity and span, our company can design and manufacture non-standard.